Airport Complex, Redcliff Perth

Contract Value:

Circa $800K

Contract Duration:

Circa 17 Months

Our Contract:

  • DDC Controls Design & Installation
  • Mechanical Electrical Installation
  • BMS Design & Commissioning
  • Front End Graphics

Scope of Works:

  • Lonworks Open Systems Integration
  • Circa 3000 BMS Points
  • 8 MSSB Control Panels
  • Open Systems BMS Front End
  • Fibre Optic connections between the International and Domestic Terminals