500 Hay St

Site: 500 Hay

Site Address: 500 Hay Street, Subiaco WA

Principal: Dradgin Pte Ltd

Mechanical Contractor: CMS Engineering

Builder: Cooper & Oxley

Consultant: Norman Disney & Young

Services: Mechanical Electrical; BMS; EMS; Service and Maintenance

summary

In early 2016, Leopard Controls was awarded the 500 Hay Street Project, a significant redevelopment located in Subiaco, Perth. The project involves the transformation of the former ACE Cinemas site into a mixed-use development featuring a 6-level office building with 10,324 sqm of net lettable area, a 10-storey hotel, world-class luxury cinemas, and a 1,500 sqm landscaped plaza. The office space is designed to achieve a 5 Star Green Star rating, with large floor plates of over 2,000 sqm. The site is situated near Rokeby Road and the Subiaco train station, making it a key development in reinforcing the active retail frontage in the area. The hotel will provide much-needed accommodation, while the office building will meet PCA Class A standards, ensuring premium office space. Completion of the project was scheduled for late 2016.

solution

Leopard Controls delivered a comprehensive Mechanical Electrical and DDC system featuring:

  • Distech Controls DDC Controls Design & Installation
  • Mechanical Electrical Installation
  • Niagara N4 BMS Design & Commissioning
  • Integration with Metering Remote web access with email alerts for critical alarms
  • Front End Graphics
  • Nabers Data Collection & Reporting
  • Circa 2000 BMS Points
  • 7 MSSB Control Panels
  • Open Systems BMS Front End
  • UPS Backed BMS hardware
  • Fibre Optic & CAT5 BMS Networks
  • Extensive integration of electrical and Hydraulic services